The Grove – Parapet Coping Replacement Works

Who

Private Residential Client / NHBC Insurance Claim

What

Parapet Coping Replacement & Building Defect Rectification

Where

Effingham, Surrey

Project Overview

At Home Services was appointed to undertake a programme of parapet coping and roofline remedial works at The Grove, Effingham, a residential development comprising terraced townhouses.

The works formed part of an NHBC insurance claim relating to defects arising from the original construction, with At Home Services brought in to rectify issues associated with the existing parapet coping installation and provide an effective, durable weathering solution to the affected properties.

The works covered Nos. 13–18 The Grove and centred on the removal of the existing parapet copings, preparation of the underlying substrates and installation of new mechanically fixed coping systems. The works were programmed over a 12-working-week construction period.

A key consideration throughout the project was that the properties remained fully occupied for the duration of the works. At Home Services therefore had to coordinate high-level external remedial works while maintaining safe access to each home, protecting residents and minimising disruption within the wider development.

Challenges and Requirements

The Grove presented a number of technical and logistical challenges due to the nature of the NHBC remedial works, the requirement to rectify defects within the original construction and the need to undertake high-level works while all six properties remained occupied.

  1. NHBC Insurance Claim & Defect Rectification: The project was undertaken as part of an NHBC insurance claim relating to the original construction. Rather than constructing a new building element from scratch, At Home Services was required to carefully remove the defective existing installation, assess and prepare the retained substrate and deliver the specified replacement solution without unnecessarily disturbing the surrounding building fabric.
  2. Rectifying Existing Construction: Working with an existing defective detail required a different approach from new-build construction. Existing elements had to be exposed progressively, with the condition of the underlying construction established as works proceeded and appropriate preparation undertaken before the new mechanically fixed coping system could be installed.
  3. Occupied Residential Environment: All six houses remained occupied throughout the programme. Access had to be maintained throughout the working day while activities were managed to minimise inconvenience and nuisance to residents and neighbouring properties.
  4. Maintaining Weather Protection: Removal of the existing coping temporarily exposed sections of the cavity walls and building envelope. Temporary waterproofing and protection therefore formed a critical part of the methodology to protect the occupied homes against water ingress while individual sections were opened up.
  5. Working at Height: The works were predominantly undertaken at roof and parapet level and required comprehensive scaffold access. Ground-level scaffold poles required additional protection, with ladders removed at the end of each working day to prevent unauthorised access.
  6. Resident & Public Safety: The development remained accessible to residents and visitors throughout construction. Working areas therefore required segregation, secure fencing and appropriate signage, while emergency-service access to all properties had to remain available.
  7. Restricted Site Logistics: Contractor parking was restricted to the highway, with on-site access principally required for deliveries. Working and storage areas were also restricted to designated parts of the development, requiring careful coordination of materials, waste and site movements.
  8. Protection of Existing Property: As a targeted remedial project rather than a wholesale refurbishment, the existing homes, roofs, façades and adjoining construction had to be protected throughout. The specification required removal to be limited to the minimum necessary, with replacement work appropriately integrated with the retained construction.

Project Execution

At Home Services managed the works as a coordinated defect rectification and external refurbishment programme, sequencing operations across the individual properties to maintain weather protection and minimise the period for which individual parapet areas remained exposed.

The works included:

  • Site Establishment & Access: Establishment of controlled working and storage areas, temporary fencing and security measures, together with scaffold access to the roofline and parapets.
  • Removal of Defective Copings: Careful removal of the existing parapet coping installation associated with the original construction defects, while limiting disturbance to the surrounding retained building fabric.
  • Inspection & Substrate Preparation: Exposure and preparation of the underlying parapet construction to establish a suitable base for the replacement system.
  • Temporary Weather Protection: Installation and maintenance of temporary waterproofing measures while cavity walls and parapet substrates were exposed, protecting the occupied properties throughout the remedial process.
  • New Coping Installation: Supply and installation of the replacement mechanically fixed coping system, providing a durable new weathering detail to the parapet walls.
  • Existing Fabric Protection: Protection of roofs, façades, adjoining structures and other retained elements throughout the works, with localised making good undertaken where necessary.
  • Resident Access Management: Maintenance of safe pedestrian access to all occupied homes throughout the programme, alongside segregation of construction activities from residents and visitors.
  • Quality Control: Inspection of preparatory and completed works to ensure installations were secure, accurately aligned and completed in accordance with the project specification.
  • Progress Records: Regular progress and photographic records were maintained throughout the works, with the project specification requiring photographs from 12 locations at fortnightly intervals and a complete set of as-built record photographs on completion.
  • Snagging & Handover: At Home Services undertook its own snagging and de-snagging prior to the formal pre-handover inspection, allowing outstanding items to be addressed ahead of Practical Completion.

Outcome

The Grove project delivered a comprehensive rectification of defective parapet coping across six occupied residential properties, addressing issues associated with the original construction and providing a more robust and durable roofline solution.

As the works formed part of an NHBC insurance claim relating to the original builder’s works, At Home Services was appointed to undertake the remedial construction necessary to correct the existing defects and reinstate the affected parapet areas to the required standard.

The defective existing copings were removed, the underlying construction prepared and a new mechanically fixed coping system installed across the affected properties.

Importantly, the project was completed while the development remained fully occupied, requiring At Home Services to balance efficient delivery with resident safety, continuous property access and protection of the existing homes from the weather throughout the remedial works.

The project demonstrates At Home Services’ ability to take responsibility for complex remedial projects where defects from previous construction need to be investigated and rectified, rather than simply delivering new-build works. It also demonstrates our experience working within the requirements of an insurance-backed remedial scheme and coordinating closely with the wider professional team.

The Grove demonstrates At Home Services’ capability in delivering NHBC insurance remedial works, defect rectification and specialist external refurbishment, combining technical building-envelope repairs, scaffolding and working-at-height operations, temporary weather protection, resident liaison and careful integration with existing construction within a live residential environment.

Want to work with us?

If you are a Subcontractor who is interested in working with us under our Approved Suppliers and Partner Supplier Scheme please complete and submit the below form

Start a Conversation

Experience the difference with At Home Services, where craftsmanship meets creativity, and your vision becomes reality. Contact us today to discuss your project and discover how we can bring new life to your residential or commercial property in the South of the UK